Community Corner

Nearby: Pipe Installation on Broughton Road Sept. 17-21

Work will occur between Route 88 and Gerhold Street.

Crews from the  will perform pipe installation to improve drainage along a portion of Broughton Road in Bethel Park from Monday, Sept. 17, through Friday, Sept. 21, weather permitting.

The work will span Broughton from Gerhold Street to Route 88, according to a news release.

The pipe installtion is not expected to cause long-term delays. Nevertheless, PennDOT advises motorists to use caution, slow down and anticipate changing traffic patterns when traveling through the area.

Find out what's happening in Baldwin-Whitehallwith free, real-time updates from Patch.

Broughton Road is already seeing some PennDOT work, as a  is necessitating the closure of eastbound Broughton from Paxton Drive to Sansue Drive through at least late November.

Westbound Broughton is still open in a single lane from Sansue to Paxton.

Find out what's happening in Baldwin-Whitehallwith free, real-time updates from Patch.

 ---

Follow the Baldwin-Whitehall Patch on Facebook and Twitter.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here