patching...
Update: Receive Baldwin and Whitehall news in your inbox by subscribing to our daily newsletter ... »
Welcome back, Patch Blogger!

EXTENDED: Pothole Patching on Route 51

The work will run from the West End Bridge to Curry Hollow Road.

 

For the second time in a month, crews from the Pennsylvania Department of Transportation District 11-0 will cause temporary lane closures and restrictions for pothole patching across a large part of Route 51.

The patching, which will run from the West End Bridge to Curry Hollow Road, will last from Jan. 7 to 25, at the least. That is an approximately 8.7-mile stretch.

The work will occur in various locations across the busy state road, possibly hitting the Pittsburgh neighborhoods of West End, Duquesne Heights, BeechviewMount Washington, Beltzhoover, Bon Air, Brookline, Carrick and/or Overbrook, and/or the boroughs of Whitehall, Brentwood and/or Baldwin.

Motorists are advised to use caution, slow down and expect changing traffic patterns when traveling through the work area.

Read about other roadwork in and around Baldwin-Whitehall here.

 ---

Follow the Baldwin-Whitehall Patch on Facebook and Twitter.

Sign up for the daily Baldwin-Whitehall newsletter.

Related Topics: Baldwin Borough, Beechview, Beltzhoover, Bon Air, Brentwood Borough, Brookline, Carrick, Construction, Curry Hollow Road, and Duquesne Heights

Patch_comments_icon

Robert Edward Healy, III

9:36 pm on Sunday, January 13, 2013

UPDATE: This project has been extended for at least Monday to Friday, Jan. 14 to 18.

Reply

Frank

9:56 pm on Sunday, January 13, 2013

good. I almost got lost in a pothole today! Lol

Reply
Patch_comments_icon

Robert Edward Healy, III

12:01 am on Tuesday, January 22, 2013

UPDATE: This project has been extended for at least Tuesday to Friday, Jan. 22 to 25.

Reply

Leave a comment